Stone Harbor Beach Fill

BeachProject  BeachSept

An article in the local paper indicated that North Wildwood was next on the list for the beach fill project, but the signs posted at the beach entrances state otherwise.

The equipment will arrive on Sunday of Labor Day weekend (that should be interesting)- to the staging area on 111th Street.  The actual pumping of sand is scheduled to start on Wednesday, September 9th- working north toward 98th Street over a period of 9 days.   The beaches will be closed in the immediate area of pumping (approximately 3 blocks at a time).

It will be an inconvenience, but the end result should be a huge improvement to our battered beaches.

This entry was posted in Life at the Shore, Stone Harbor, New Jersey- News. Bookmark the permalink. Post a comment or leave a trackback: Trackback URL.

Post a Comment

Your email is never published nor shared. Required fields are marked *

*
*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

Tim Kerr Sothebys Logo