Friday morning: A tug boat brought a platform with a crane very close to shore…
Â
Â
Â
Â
Â
The tri-pod used by the dredging company during the Stone Harbor beach fill was driven off the beach and into the ocean…
Â
Â
Â
Â
Â

The man driving the tri-pod attached a hook from the crane, and then climbed down from his post onto the floating platform. The crane lifted the tri-pod up and over to the center of the platform. Once the equipment was secured, the tug pulled it all back out to sea!
It was soooooo cold for a beach walk, but I would miss all of this “excitement” on my treadmill 🙂

With the tide going out, we could walk along the water’s edge and get a perspective of the amount of new sand on the beach. Mother Nature and the Borough of Stone Harbor will make sure the slope to the ocean is safe well before the summer season.
It was just September…right? Â
 The beach replenishment continues- picture taken from the 101st Street pavilion in Stone Harbor- looking south.

After just 24 hours, the hard working crew from the dredging company has made great progress on the 110th/ 111th Street beach. The sand is coming out of the pipe even more forceful than last night (the center of the picture).  Anxious for the sand to dry to see the finished product.
Amazing…in just a few hours, a new beach in Stone Harbor.  
The dredge is positioned in the inlet between Stone Harbor and North Wildwood. Sand travels through pipes to the staging area (111th Street). The pipe will be extended as the project moves north through the next week to 10 days.
 Left the soggy seashore Saturday night in time for a snow storm in Denver.
Back in the moist air this morning. The beach fill equipment is in place (again) in Stone Harbor- perfect timing after the coastal storm!